Professional China Boom Bushing - Excavator Link bushing R55 – JiaLe

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

That has a sound business credit history, outstanding after-sales service and modern producing facilities, we have earned an superb popularity amid our buyers across the planet for Excavator Tooth Pin, Bobcat 331 Bottom Roller, John Deere Pin On Bucket, Our Enterprise Core Principle: The prestige 1st ;The quality guarantee ;The customer are supreme.
Professional China Boom Bushing - Excavator Link bushing R55 – JiaLe Detail:

Product Details

Link Bushing

Material

45#

Part No.

Excavator Link bushing R55

Color

Bule or Customer Required

Logo

JALE or Customer Required

MOQ

10pc

Packing

Plywood Pallet or Customer Required

Delivery time

15-20days(one container)

Suitable machine

All Brands

Warranty

36 months

Loading port

Qingdao; Lianyungang; Rizhao…

Certificates

ISO9001,SGS

Payment

T/T;L/C; Ail Trade Assurance; Western Union…

Appearance and process: Adopting medium frequency heating, hot forging process, or cold forging process of multi- location molding machine, then net belt heat.
Surface treatment available: Zn- Plated, Ni- plated, Passivated, Tin- plated, Sandblast, Anodize; Polish, Plain, Chrome plated; Hot Deep Galvanize(H. D. G. ) etc.
Heat Treatment: Tempering, Hardening, Stress Relieving.

Details Display

3
2
1

Features

Excellent lubrication performance
The most practical 8-shaped oil groove is adopted to ensure that the bushing has the best lubrication effect and prolong the service life of the bushing.
Longer Antirust
The original bucket bushing has been wiped with the good antirust oil and well packed, the black one has been finished with electrophoresis treatment, which ensures our bushing can be kept

Parameters

Link Bushing

Size              (Diameter*Height)mm

Size (Diameter*Height)mm

Size (Diameter*Height)mm

Size (Diameter*Height)mm

Size (Diameter*Height)mm

30*50*30

60*70*60

71*86*40

85*100*80

95*110*60

35*45*45

60*70*80

71*86*50

85*100*90

95*110*100

40*50*45

60*75*50

71*86*60

85*100*100

95*110*115

40*50*60

60*75*55

71*86*65

85*100*105

95*110*120

45*55*50

60*75*60

71*86*70

85*100*120

100*115*70

45*60*50

60*75*65

75*90*90

90*100*100

100*115*100

50*60*60

60*75*70

80*96*70

90*106*150

100*116*90

50*65*60

60*75*75

80*100*50

90*110*50

100*130*100

55*70*60

60*75*80

80*100*60

90*110*70

100*130*120

55*70*70

65*80*80

80*100*70

90*110*75

110*135*100

55*70*40

70*80*80

80*100*80

90*110*80

110*135*100

55*70*50

70*85*80

80*100*85

90*110*90

110*135*110

55*70*60

70*85*85

80*100*90

90*110*96

120*135*110

55*70*65

70*85*90

80*100*100

90*110*115

120*140*100

55*70*70

70*85*100

80*100*110

90*115*100

120*140*120

55*70*80

70*85*146

80*100*120

90*120*100

125*140*90

And so on

 Be customized according to customer requirements


Product detail pictures:

Professional China Boom Bushing - Excavator Link bushing R55 – JiaLe detail pictures

Professional China Boom Bushing - Excavator Link bushing R55 – JiaLe detail pictures

Professional China Boom Bushing - Excavator Link bushing R55 – JiaLe detail pictures

Professional China Boom Bushing - Excavator Link bushing R55 – JiaLe detail pictures


Related Product Guide:

No matter new shopper or old customer, We believe in very long expression and dependable relationship for Professional China Boom Bushing - Excavator Link bushing R55 – JiaLe , The product will supply to all over the world, such as: Austria, Slovenia, Palestine, We integrate all our advantages to continuously innovate, improve and optimize our industrial structure and product performance. We will always believe in and work on it. Welcome to join us to promote green light, together we will make a better Future!
  • The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
    5 Stars By Jenny from Panama - 2018.06.19 10:42
    The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Colin Hazel from Wellington - 2017.11.20 15:58
    Write your message here and send it to us